Contract Executed
S. No | Description of Works | Name and Address of Employer |
---|---|---|
1 | Construction of Ash Bund and Allied civil works at PTPP at Panipat (Haryana) | Chief Engineer/ PTPP, HPGCL, Panipat (Haryana) |
2 | Laying of Sub-surface Drainage and Related works in Kalayat are underHOPP | Dy. Project Director, Haryana Operation Pilot Project (HOPP), 15A, Chaman Garden, Railway Road, Karnal (Haryana) |
3 | Raising of Ash Dyke for augmentation of storage capacity of new ash pond FTPS, Faridabad (Haryana) | Chief Engineer/ Thermal, Faridabad Thermal Power Station, HPGCL, Faridabad (H.R) |
4 | Construction of Raising of ash bund phase(IV) from EL-104.75 to EL-108.25M with lagoon ash and allied civil works at PTPS, Panipat (Haryana) | Chief Engineer (O&M), PTPP, HPGCL, Panipat (Haryana) |
5 | Civil works like area grading & levelling, laying of roads, drains and culverts, external water supply & sewerage works and other allied works for new quarters at Panipat Refinery township, Panipat (HR.) | Sr. Project Manager (Px-Pta), Panipat Refinery, IOC Ltd., Panipat |
6 | 3rd Raising of Ash dyke at NTPC Singrauli | NTPC Ltd., Singrauli Super Thermal Power Station, Shaktinagar, Distt. Sonebhadra (UP) |
7 | Rehabilitation of Longewala Disty. & its minor of Bhakra Canal System under RWSRP at Distt. Hanumangarh (Package No. BK-7) | Executive Engineer, Division-II, Irrigation Department, Hanumangarh Jn. (Rajasthan) |
8 | Rehabilitation of LMC and its Disty. System of Gudha/ Burdha Irrigation Project, Distt. Bundi(Rajasthan) | Executive Engineer, Irrigation Division, Bundi (Rajasthan) |
9 | Construction/ upgration of 8/6 Laning expressway for Delhi-GurgaonProject | D.S. Construction Limited |
10 | Construction of Raising of Ash Dyke phase III & IV combined and allied civil works at BTPS, NewDelhi | NPCC Limited, Faridabad |
11 | 4th Raising of Ash Dyke at NTPC Singrauli | NTPC Ltd., Singrauli Super Thermal Power Station, PO: Shaktinagar, Distt. Sonebhadra (UP) |
12 | Site Levelling cum Ash Dyke Package for NTPC, Vindyanagar | NTPC Ltd., Vindyachal Super Thermal Power Project |
13 | Raising of Ash Dyke (Phase-V) and allied civil works at PTPS, Panipat | Executive Engineer (CMDP-II), PTPP, HPGCL, Panipat (Haryana) |
14 | First raising of Ash Dyke in Phase-V of NTPC Badarpur, New Delhi | NTPC Ltd., Badarpur Thermal Power Station, Badarpur, New Delhi |
15 | 3rd Raising of Ash Dyke Phase-II of NTPC,Badarpur | NTPC Ltd., Badarpur Thermal Power Station, Badarpur, New Delhi |
16 | Earthwork in formation i.e. cutting and filling from km. 40.185 to km. 43.145 in zone no. 16 | Dy. Chief Engineer/ Const., Northern Railway, Chandigarh |
17 | Construction of Group Housing Society, Dwarka New Delhi | Amit Buildwell Pvt. Ltd., Gurgaon |
18 | Raising of Ash Dyke Unit 1 to 6 and allied civil works at PTPS, Panipat | Executive Engineer (CMDP-II), PTPS, HPGCL, Panipat |
19 | Earthwork in formation i.e. cutting and filling in zone no. 15 | Dy. Chief Engineer/ Const., Northern Railway, Chandigarh |
20 | Construction of raising of Ash Dyke for Unit 7 & 8 at PTPS,Panipat | Executive Engineer (CMDP-II), PTPS, HPGCL, Panipat |
21 | Civil works for ash dyke decantation well and its approach for AHP-Bhillai | BHEL, Bangalore |
22 | Construction of Starter Ash Dyke (Lagoon I & II) package for Bhillai Expansion Power Project | NTPC-SAIL Power Company Private Limited, Bhillai |
23 | Construction of Residential Apartments Sector- 89 Faridabad | Amit Buildwell Pvt. Ltd., Gurgaon |
24 | Earthwork in filling, embankment and cutting provision of blanketing material, construction of bridges and other allied works between km. 49.00 to km. 74.40 on Rewari - Jhajjar - Rohtak section in connection with Rohtak- Jhajjar- Rewari New Line | Northern Railway |
27 | Construction of RCC drains and associated works for ETP for 3x660MW Super Critical, Coal based ThermalPower Project at Lalitpur, UP | Anand Projects Limited |
28 | Design, Engineering, Procurement and Construction of Hotel Building Project at Plot No. 45-46, Old Judicial Complex, Gurgaon with Supply of all material of Construction and all equipments for Modern facilities including installation of Photovoltaic Solar System Complete with 100% Power Backups. | D.S. & Bros. (Builders) Pvt. Ltd. SCO No. 45 & 46 OJC, Gurgaon (Haryana), |
29 | Main Water supply package for Captive Power Plant-I at Village Hirma,Distt. Jharsuguda | SNC Power Generation Limited |
30 | Ash Dyke Package for Aravali Power Company Pvt. Ltd. | Aravali Power Company Pvt. Ltd. |
31 | Construction of Ash Pond for Jhajjar Power Ltd. | Jhajjar Power Ltd. (A Unit of CLP) |
32 | Ash Dyke package for Singrauli Super Thermal Power Station | NTPC Ltd., Singrauli Super Thermal Power Station, Shaktinagar, Distt. Sonebhadra (UP) |
33 | First Raising of Ash Dyke at Singrauli Super Thermal Power Station | NTPC Ltd., Singrauli Super Thermal Power Station, Shaktinagar, Distt. Sonebhadra (UP) |
34 | Strengthening/Buttressing of Existing Dyke at Dhanras Ash Dyke of NTPC, Kroba | NTPC Ltd., Korba Super Thermal Power Station, Jamnipali, Distt- Korba |
35 | Ash Dyke Package for Korba Super Thermal Power Project | NTPC Ltd., Korba Super Thermal Power Station, Jamnipali, Distt- Korba |
36 | Ist Raising of Ash Dyke Lagoon V3A | NTPC Ltd., Vindhyachal Super Thermal Power Station, PO: Vindhyanagar, Distt. Singrauli |
37 | 2nd raising of ash dykephase-V | NTPC Ltd., Badarpur Thermal Power Station, Badarpur, New Delhi |
38 | Ist Raising of Lagoon-3A at Korba | NTPC Ltd., Korba Super Thermal Power Station, Jamnipali, Korba |
39 | Raising of Ash Dyke for Unit 7 & 8 at PTPS, Panipat (using steel & PVC coated gabions, Geo Grids and Geo Textile etc.) | Panipat Thermal Power Station, HPGCL Panipat |
40 | Construction of Ash Pond-I at L&T Rajpura | L&T Rajpura Thermal Power Project, Rajpura, Punjab |
41 | Raisings of Ash Dyke for RGTPP, Khedar (Hisar) (using steel & PVC coated gabions, Geo Grids and Geo Textile etc.) | Rajiv Gandhi Thermal Power Plant, Khedar (Barwala), Hisar |
43 | Construction of Office Buildings, Interior works, boundary wall, peripheral road along with RCC covered drain and allied civil works for 2x45 MW Thermal Power Projects of Bajaj Infrastructure Development Company Ltd. In UP | Bajaj Infrastructure Development Company Ltd. |
44. . | Providing distribution mains for Recycle water for zone I ,II &III, U/E, Gurgaon | HUDA, Gurgaon (Haryana) |
45 | Augmentation of Water Supply Scheme for Zone-I (Sectors-33, 34, 39, 41, 42, 45, 91 & Green field), Faridabad | HUDA Faridabad (Haryana) |
46 | 5th Raising of Dhanras Ash Dyke after its buttressing | NTPC Ltd. Korba Super Thermal Power Station, Jamnipali, Korba |
47 | Up-gradation of Civic Infrastructure in Industrial Sector- 4, 6, 24 & 25 in Faridabad under ASIDE Scheme (concrete road) | Haryana State Industrial & Infrastructure Development Corporation Ltd., Panchkula |
48 | Construction of Ash Pond-II at Rajpura Thermal Power Project | L&T Rajpura Thermal Power Project, Rajpura, Punjab |
49 | 1 MW Solar Power Plant at Khatoti Khurd, Narnaul, Haryana | HPPC, Panchkula Haryana PPA Mode |
50 | Civil works of First Raising of Ash Dyke (L- III) from 10.5 RL to 15.5 RL at NTPC Simhadri | NTPC Ltd. Simhadri Super Thermal Power Station PO: Simhadri, Distt. Vishakhapatnam |
51 | Up gradation and commissioning after conversion of existing 6 MLD capacity sewage treatment based on Moving Bed Biological Reactor Technology at Nilokheri Town Distt. Karnal (Design, Engineering and Construction) | PHED, Haryana |
52 | Up gradation and commissioning after conversion of existing 5.5 MLD capacity sewage treatment based on Moving Bed Biological Reactor Technology at Taraori Town Distt. Karnal (Design, Engineering and Construction) | PHED, Haryana |
53 | Up gradation and commissioning after conversion of existing 7 MLD capacity sewage treatment based on Moving Bed Biological Reactor Technology at Ladwa (Design, Engineering and Construction) | PHED, Haryana |
54 | Ash Dyke Package for Gadarwara Super thermal Power Project | NTPC Ltd., Gadrawara, Distt. Narsinghpur |
55 | Design, Supply & Installation of Sewerage Treatment Plant at MUNPL Township | Meja Urja Nigam Pvt. Ltd. (A Joint Venture of NTPC & UPRVUNL) Meja, Distt. Allahabad |